Engineering Projects & Construction
The Town of Bradford West Gwillimbury manages its infrastructure and assets to ensure that reliable service is provided to businesses and residents. This means that the Town must occasionally undertake to rehabilitate, or replace aging water, wastewater and stormwater infrastructure in the Town, as well as bridges and roadways under the Town’s control. Generally, this is done by prioritizing projects on the basis of need and ensuring that replacement work is coordinated to minimize disruptions.
For Construction related public notices, please visit our Public Notices page.
The tables below summarizes projects that are ongoing in the Town.
Urban Road Construction & Infrastructure Replacement Projects
| Project | Description | Project Schedule |
| Toronto St., James St., Hurd St. Reconstruction | Design and construction for replacement of existing watermain, sewer (as needed) and road rehabilitation. |
Design – completion June 2011 Construction – commencing Spring 2012 |
| 5th Line and 5th Sideroad Bridges | Bridge replacement at Canal Road on 5th Line, as well as at Canal Road on 5th Sideroad. |
Design - 2011 Construction (5th Sideroad Bridge) – commencing Fall 2012 |
| Holland Street East / West Reconstruction | Design and construction for rehabilitation of road and underground infrastructure in the downtown area. |
Design – expected to commence in 2012 Construction – expected in 2013 (Holland St. East) and 2014 (Holland St. West) |
| Melbourne Drive Widening | Detailed design and construction to widen Melbourne Drive from Holland Street West to Lion’s Gate. | Design - 2012 |
Water & Wastewater Project's
| Project | Description | Project Schedule |
| Green Valley Sanitary Pumping Station | Design and construction of a Sanitary Pumping Station in the Green Valley area. |
Design – 2011/2012 Construction – 2013/2014 |
Engineering Studies & EAs
| Project | Description | Project Schedule |
| Bradford Water Pollution Control Plant (WPCP) Expansion | Class EA, detailed design and construction of WPCP expansion to service OPA 15, OPA 16 as well as meet new Phosphorus targets for Lake Simcoe. | Completion January 2012 (Class EA) |
| Roads Needs Study | Study to assess the condition of existing roads in the Town of Bradford West Gwillimbury. | Completion Spring 2012 |
| Inflow and Infiltration Study | Study to determine areas in the Town where inflow and infiltration are most prominent in the sanitary sewer system. | Summer 2012 |
| Asset Management Plans and Strategies | Strategy to improve infrastructure replacement planning in BWG. | Early 2012 |
| 400 / 5th Line Interchange | Class EA, detailed design and construction for a new interchange at 5th Line and Hwy 400. | Class EA – completed |
| South West Arterial Road | Class EA, detailed design and construction for arterial road from 6th Line, along 10 Sideroad south to 5th Line, and west along 5th Line. | Class EA – completed |
| South East Arterial Road | Class EA, detailed design and construction for arterial road from Holland St. E. and Bridge Street at Dissette St., south connecting at Luxury Ave. And Simcoe Road intersection. | Class EA – completed |
| Middletown Sanitary Pumping Station | Class EA, detailed design and construction of Sanitary Pumping Station near 10th Sideroad. | Class EA - 2011 |
| Professor Day Drive Extension | Class EA, detailed design and construction of Professor Day Drive north of 8th Line. | Class EA – 2011 |
| Development Charge Background Study Update |